Pre-Development Studies for Samtah Solar Project

Year: 2023 – 2024
Brief: Development of the Park Master Plan and design for permitting, performing environmental baseline surveys, obtaining permits, and conducting studies for park hydrological, topographical, and geotechnical assessment of the area.
Pre-Development Studies for Ad-Darb Solar Project

Year: 2023 – 2024
Brief: Development of the Park Master Plan and design for permitting, performing environmental baseline surveys, obtaining permits, and conducting studies for park hydrological, topographical, and geotechnical assessment of the area.
Pre-Development Studies for Shamlul Wind Project

Year: 2024 – 2025
Brief: Development of the Park Master Plan and design for permitting, performing environmental baseline surveys, obtaining permits, and conducting studies for park hydrological, topographical, and geotechnical assessment of the area.